Episodes
Wednesday Mar 30, 2022
Insider Podcast-Road Projects Update
Wednesday Mar 30, 2022
Wednesday Mar 30, 2022
Road improvements slated in 2022 are highlighted on this episode of “The Insider,” the City’s official podcast. Chris Griffith, executive director for Public Infrastructure, highlights multiple projects. Improving traffic flow and reducing traffic congestion is the aim of major street improvements to widen roadways or add turn lanes, as well as sidewalks and multi-use paths. The Rutherford Blvd. Extension is the latest of these improvements to be announced and approved by City Council.
This 30-minute edition of “The Insider” features:
• A new pedestrian-friendly bridge on Brinkley Road near Blaze Drive and Timber Creek
• Chaffin Place at Old Fort Parkway and Thompson Lane
• Phase 2 of Rucker Lane between Muirwood Blvd. and Hwy 96 (Franklin Road)
• Beasie Road and River Rock Blvd. Connector Bridge
• Phase 2 of New Salem Hwy east of I-24 to Old Fort Parkway
Version: 20240320
Comments (0)
To leave or reply to comments, please download free Podbean or
No Comments
To leave or reply to comments,
please download free Podbean App.