Episodes
Friday Feb 05, 2021
Insider Podcast: Road Projects in Murfreesboro
Friday Feb 05, 2021
Friday Feb 05, 2021
Updates on many of Murfreesboro’s road projects (roads, bridges and sidewalks) are featured in this podcast. The guest is City Engineer Chris Griffith. Projects discussed include...
- River Rock-Beasie Road Bridge over Stones River
- Warrior Drive Exension to Beasie Road near New Salem Hwy
- Cherry Lane Phase 2 and Phase 3
- Thompson Lane: NW Broad to Memorial by TDOT
- Brinkley Road Bridge near Blaze Drive
- New Salem Highway (Hwy. 99) by TDOT (3 Phases)
- Rucker Lane Phase 1 from Muirwood to Veterans Parkway
- Mercury Blvd. pedestrian sidewalks
- Bradyville Pike from Rutherford Blvd. to Broad St.
Version: 20240320
Comments (0)
To leave or reply to comments, please download free Podbean or
No Comments
To leave or reply to comments,
please download free Podbean App.