Insider Podcast: Road Projects in Murfreesboro

Updates on many of Murfreesboro’s road projects (roads, bridges and sidewalks) are featured in this podcast.  The guest is City Engineer Chris Griffith.  Projects discussed include...

  • River Rock-Beasie Road Bridge over Stones River
  • Warrior Drive Exension to Beasie Road near New Salem Hwy 
  • Cherry Lane Phase 2 and Phase 3
  • Thompson Lane:  NW Broad to Memorial by TDOT 
  • Brinkley Road Bridge near Blaze Drive
  • New Salem Highway (Hwy. 99) by TDOT (3 Phases)
  • Rucker Lane Phase 1 from Muirwood to Veterans Parkway
  • Mercury Blvd. pedestrian sidewalks 
  • Bradyville Pike from Rutherford Blvd. to Broad St.
Share | Download(Loading)

Episodes Date

Load more

Podbean App

Play this podcast on Podbean App