Updates on many of Murfreesboro’s road projects (roads, bridges and sidewalks) are featured in this podcast. The guest is City Engineer Chris Griffith. Projects discussed include...
- River Rock-Beasie Road Bridge over Stones River
- Warrior Drive Exension to Beasie Road near New Salem Hwy
- Cherry Lane Phase 2 and Phase 3
- Thompson Lane: NW Broad to Memorial by TDOT
- Brinkley Road Bridge near Blaze Drive
- New Salem Highway (Hwy. 99) by TDOT (3 Phases)
- Rucker Lane Phase 1 from Muirwood to Veterans Parkway
- Mercury Blvd. pedestrian sidewalks
- Bradyville Pike from Rutherford Blvd. to Broad St.
Version: 20241125
Comments (0)
To leave or reply to comments, please download free Podbean or
No Comments
To leave or reply to comments,
please download free Podbean App.